|
|
Flywheel with good used starter one way installed |
Back side view |
|
|
Carbs were taken completely apart soaked in
vinegar, CLR, and acid based aluminum cleaner. |
All reassembled and ready for carb kits. |
|
|
Cylinder head cleaned, inspected, and blasted. |
Needs all new valves so will be one of the last
things done on the engine. |
|
|
Cylinder cleaned, inspected and blasted. |
Rough bored to within .007 of .020 over to make
sure the rust pits would hone out. |
|
|
Stripping it to the bare frame to get ready for
sand blast. |
Once blasted the frame and subframe will be powder
coated black. |
Previous Page,
1, 2,
3, 4, 5,
6, 7,
8, 9,
10, 11
Next Page |
|