|
|
Swing arm appears to be in pretty good shape so it
will be set aside till assembly. |
Down to the bare frame ready for blasting. |
|
|
Brian this one is for you. Yet another ice cream
tub of bolts to clean. |
The pile of puzzle parts waiting for re-assembly. |
|
|
Sub frame welded in places that needed repair and
glass bead cleaned. |
Shock link pivot clearanced so it can be flipped
to lower the rear end. |
|
|
Cutting the valve seats on the Tobin Arp at work. |
Finished head ready for new parts and
assembly. |
|
|
Lower a-arms stripped and blasted. |
Bottom side before and after blasting. |
|
|
Nothing but great work comes out of this guys
shop!! |
Sitting on the slab at MTS ready for gloss black
powder coat. |
Previous Page,
1, 2,
3,
4, 5, 6,
7, 8,
9, 10,
11 Next Page |
|